优化图纸
2024-04-07 23:12:39
The main work on earlier stage of this Project is drawings review and in-depth design. The design department will assist competent staff from the Project Management will further design and optimize the drawings and conduct self-evaluation and joint evaluation carefully for convenience of proper and manifest guidance on construction.